Newsroom Magazine USA Edition USA Edition Today Is Wednesday, May 22, 2013

Contact Information

Newsroom Banner




There is a higher calling — one that rests in an honored realm beyond the ordinary affairs of men.

It is a sacred place — having been erected in the traditions of freedom, and consecrated in the blood of those who have paid the ultimate price in pursuing journalism’s enduring quest for truth.

The Honorable House Of The Fourth Estate being that place in the American experience where the bells of freedom ring loud and clear so that all free men and women shall forever know what matters most to their livelihoods, families, communities and nation.

Credible - Responsible - Probative

Credibility is the foundation for all journalism no matter medium or method of transmission.

Relevancy to our livelihoods, families, communities and nation are central to how we define news.

New media journalism is a servant of the people.

Being relevant demands that new media journalism stand-in for our viewers, readers, listeners or visitors and defend the public’s right to know what persons, institutions and governments are doing in the name of free and sovereign citizens.

Experienced and credible new media news services are tenured, qualified and full fledged members of the free press, second to none and equal to all.

Probity, accuracy, balance, provenance, and credibility in journalism are the currency of the realm in earning and maintaining public trust and confidence.

Robert Butche Publisher



Editorial Standards & Policies
   Browsing Energy Department Section Organized In Date Order [ 4 items ]   
First Item Earlier Middle Item Last Item
Published: Tuesday March 12, 2013 8:00 am EDT
Energy Department Section
Article Length: 1305 Words
Reading Time: 6 Minutes
Hanford Photo 1

An aerial view of Hanford’s D Area shows the D Reactor (lower left) and DR Reactor. Workers are digging 85 feet to groundwater at two sites there to remove chromium contamination.

Removing the chromium contamination is essential to preventing it from reaching the groundwater and Columbia River.

Carol Johnson, Washington Closure president

Washington

Energy Department

Hanford Deep Dig Removes Contaminated Soil

RICHLAND, Wash. – Workers at the Hanford site are digging deep into several waste sites near the Columbia River to remove soil contaminated with chromium.

The work is part of the River Corridor Closure Project, one of the largest environmental cleanup projects in the nation, managed by EM and its contractor, Washington Closure Hanford.

In Hanford’s D Area, where D and DR reactors once operated, cleanup involves digging two holes 85 feet deep. Workers began excavating one waste site in December 2012 and will start digging another this spring. The digs are part of a $12.3 million subcontract awarded to TerranearPMC to remove an estimated 2.5 million tons of waste material from the D, DR and H reactor areas. Work at the site is expected to be completed by the end of 2014.

“Remediation of the deep soil contamination removes the source of groundwater contamination and will significantly reduce lifecycle costs for groundwater treatment operations,” River Corridor Federal Project Director Mark French said.

Hanford Photo 2

Workers remove soil contaminated with sodium dichromate to prevent the chemical from reaching the groundwater and eventually the Columbia River.

An estimated 750,000 tons of material will be excavated from each area, half of which is expected to be contaminated. That contaminated material will be trucked to Hanford’s Environmental Restoration Disposal Facility for permanent disposal.

“Removing the chromium contamination is essential to preventing it from reaching the groundwater and Columbia River,” said Carol Johnson, Washington Closure president.

Workers created an initial hole to determine the extent of the contamination. It showed green and yellow staining — an indication of chromium — at 15 feet, 30 feet and finally at 50 feet.

The hole being dug is similar to an open-pit mine, wider at the top (about seven football fields in area) with gradually sloped sides — steeper slopes about halfway down — to prevent cave-ins. Lifts or layers of 15 to 18 feet have safety shelves to catch falling rocks, and soil samples are collected along the sides. The hole will be reduced to the size of about one football field at the bottom.

The contamination is the result of sodium dichromate leaked or spilled during reactor operations between the 1940s and 1960s. The reactors were placed into long-term storage, a process known as “cocooning,” several years ago.

Sodium dichromate was added to the cooling water for the reactors to prevent corrosion of the piping system. Large quantities of the chemical were transported to the reactor areas by rail cars or truck tank cars and distributed by underground piping.

Workers recently completed a similar excavation project near C Reactor, the first time a deep dig was performed at Hanford. Lessons learned are applied to the D Area project to increase efficiency.

“The River Corridor presents many risks and hazards,” Johnson said. “We are now 87 percent complete with our work, and we’ve reached this point because of a team of exceptional employees who are dedicated to working safely and efficiently.”

Source: Energy Department